READ the article: https://bit.ly/2Zl3TrC
SUBSCRIBE to the email: https://kimray.com/Subscribe
SCHEDULE training: https://kimray.com/training
=============================
- PODCAST: https://anchor.fm/oilandgas
- FACEBOOK: https://www.facebook.com/KimrayInc
- LINKEDIN: https://www.linkedin.com/company/kimray-inc/
- PRODUCT & TECHNICAL SUPPORT: [email protected] or 405-525-4264
- CAREERS @ KIMRAY: https://kimray.com/Careers
---
In this oil and gas training video, we're going to follow the pipes on a well site and explain how each piece of production equipment works. From the rod pump, through the flow line and into a 2-Phase Vertical Separator. From there, we'll look at the meter run and explain the function of a Heater Treater. We'll also learn about the storage tanks and water processing before we look at the bypass lines across the site.
0:00 Production Introduction
0:13 Rod Pump and Flow Line
0:38 2-Phase Vertical Separator
1:11 Meter Run
1:55 Separator Operation
2:42 Heater Treater
Leave a comment below if you have any questions! Some question can be answered online, but for detailed technical support, email [email protected] and mention which video you're referencing.
Music by https://www.hooksounds.com