How to set CT PT ratio and 3 phase energy meter connection in Tamil,Kwh meter- Elmeasure En 8410
Electrical units basics
https://youtube.com/playlist?list=PLr1ZL_UmrFSBKA8_bTgN8EZG8Ve3_cL9-
In this video following topics are explained
How to set CT and PT ratio in digital energy meter
How to view electrical parameters in Elmeasure energy meter en8401 demand controller
why we are avoiding analog energy meters
Basic setting in energy meter-Line voltage, R Y B Phase voltage, R Y B current in amps, Frequency, Voltage Phase angle, Current phase angle, RPM, Unbalance voltage, Unbalance current, Unbalance current, Voltage harmonics, Current harmonics, K factor
Energy parameter settings-Kvarh Inductive load, Kvarh Capacitive load, Average power factor, Interruptions count, On hour, Watt hour,
power parameter settings-Kwh, Kvar, Power factor, Kva, Raising demand, Maximum demand, Forecasting demand, Date, time, year setting, Baud rate, Meter ID communication
How to connect the energy meter-CT PT Connection, Auxiliary supply, communication
How to unlock the setup password for CT PT primary and secondary ratio settings, Pole selection
Contact Details:
Facebook link : https://www.facebook.com/GeneralEngineeringTamizh/
Instagram link : https://www.instagram.com/msaranraj07/
About our channel:
Here you can find a videos for industrial equipment basic working principle & efficient Operation maintenance in Tamizh(Tamil) with simple animation.
Electrical & Instrumentation
Transformers parts and working animations
HT/LT breakers MCB,MPCB,MCCB,ACB,VCB,starters explanation
Induction motor and alternator working animation and DG maintenance
Types of sensors and working principle with usages -RTD, Thermocouple, Proximity sensors,
Earting system and its types-TT, TN-C TN-C-S
CT- Current transformer working and connection
Electrical Distribution system,Switch yard operations,motor,VFD, DG...etc
Utility
Boiler,power plant,Chiller plant,Compressor,Fire protection systems,Water treatment plant-WTP/ETP/STP, AHU-Air handling unit,BMS-Building management system,HVAC-Heat and ventilation air conditioner.
BEE-Bureau of energy efficiency
Energy manager exam notes and previous year question paper with answer.
This channel will help for engineering students, freshers and industrial working people.
Electrical Home appliances
Fan connection and troubleshooting
UPS and inverter connection
House wiring and troubleshooting explained with simple animation
Refrigerator working animation and troubleshooting-Thermostat issues and over cooling issues explained
Electricity bill reduction ideas and basic understanding of Tamil Nadu tariff rates
AC-Air conditioner working animation and service troubleshooting
Mixer, Grinder troubleshooting and maintenance.
#Kwh-Meter#3PhaseEnergyMeter#Elmeasure#EnergyMeter#